Sustainability
Solar Array Infrastructure - Lincoln Super Storage – Lincoln, CA
Medical Vision Technology - Ophthalmology Group - Sacramento, CA
Sustainability and lower operating costs.
Solar Array Infrastructure
- Maintenance and Replacement of Solar Power Infrastructure System
Retrofit existing fluorescent lighting to LED lighting. Install smart lighting platform as well as lighting controls in historic/iconic Glenn Dairy building downtown Sacramento. Ability to control smart lighting through other smart devices